Re-leveling the chamber to restore siphon operation would be a nightmare! Keeping the old siphons working
would be one too! The lid was removed. The old siphons were removed and unused outlets plugged.
|
|
Notice the standing water line. It is clear that this chamber is severely out of level. The placement
of the siphons on opposite ends of this long chamber aggrevated the problem.
|
|
New piping was laid up to the new Flout and Alternator location. Piping was sealed into the original
vent outlets. Concrete blocks provide support, leveling, and ballast for the system's components.
|
|
The new system is ready to go. It may not be pretty but it works beautifully.
|
|
Retrofit complete and working. Drainfields now properly dosed.